Thursday 25 August 2016

Watch this space!

Today we watched the temporary staffroom being manouvered into its new location at the end of Room 21. First we watched the back half of the Portacom being lifted off the truck by a crane and lowered onto several trolley bases. It was then simply rolled into position. Then the second half was driven on site and again lifted and rolled into place, with the two halves of the building magically being joined together! Over the next couple of days, the plumbers and electricians will be connecting the water and electricity and then it will be ready for the staff to use.






No comments:

Post a Comment